Skip to content
Renomads

Bathroom Remodeling

Tiled showers, vanities, floors and fixtures, from one fixture to a full remodel.

You get a bathroom that is waterproof behind the tile, not just pretty in front.

Scope
Tiled and fiberglass showers, tubs, toilets, vanities, tile, flooring, lighting and fans.
Timeline
Two to six weeks, depending on how much changes.
What is different
We waterproof, slope the pan and size the fan before any tile goes on.

Our work

Bathrooms we have built

A bright bathroom with a white quartz vanity top, matte black faucet and a white hexagon tile floor.
  • A finished bathroom with a backlit mirror, matte black fixtures and a tub and shower combination.
  • A double vanity with two rectangular sinks, gold hardware and black sconces flanking a large framed mirror, over marble-look tile.
  • A walk-in shower lined in white subway tile with a built-in niche, beside a dark wood vanity with a white top.
  • A walk-in shower behind a black-framed glass panel, with white subway walls and a black-and-white hexagon tile floor.
  • A remodeled bathroom with a glass shower, marble-look wall tile and a long vanity with black fixtures.
  • A marble-look tiled shower with matte black fittings and a glass block window

Every photo on this site is our own work, in and around Des Moines.

Questions

Commonly asked

Tiled shower or a fiberglass unit?

Tile fits an odd space and lasts longer, and fiberglass is quicker and costs less.

Will it add value to my home?

Fixing something that does not work almost always does.

What does a bathroom remodel cost?

Tell us what you have in mind and we will build a real estimate.